Dantherm Group
Heylo

Heylo HEYWALL profi – dust control wall

Clean renovation with the Heywall profi package

Do you need quick and flexible protection against dust during renovation work? Without time-consuming masking and covering of doors, windows and furniture? The HEYWALL dust protection wall ensures clean rooms during refurbishment or renovation work and avoids annoying subsequent cleaning. The clever dust protection system for partial rooms.

The HEYWALL modular system consists of aluminium poles up to 5m high which, together with a foil and a practical entrance or exit by means of self-adhesive zip, creates a dust-tight barrier. It can be set up as a room divider, in an L or U shape or as a polygon. All angles are possible.

Installation procedure:
1. Install system rods
2. Seal the sides
3. Seal ceilings
4. Attach zipper

Heylo HEYWALL profi – dust control wall
Heylo HEYWALL profi – dust control wall
HEYWALL productvideo
HEYWALL video for application
HEYWALL productvideo
HEYWALL productvideo
Heylo HEYWALL dust control wall
Heylo HEYWALL dust control wall
Heylo HEYWALL basic - dust control wall
Heylo HEYWALL basic - dust control wall
Heylo HEYWALL entrance
Heylo HEYWALL entrance
Heylo HEYWALL profi package
Heylo HEYWALL profi package

Content professional package:

6 system rods (up to 3.60m high)
6 angle adapters
2 zippers
6 side clamps
8 sealing rails/ceiling clamps
3 carrier bags

Modules for HEYWALL

  • Extendable system bars made of aluminium including head and foot plates: Fix the head and foot plate to the system bar. Clamp the foil into the top plate. Then tighten the system pole to the desired length between floor and ceiling by pulling it out.
  • Sealing rails incl. ceiling clamps: For application on ceilings, use the sealing rail and ceiling clamps; Use sealing rail with side clamp for wall closure.
  • Side clamps: These create a wall closure together with the sealing rails. First, connect the side clamp to the sealing rail. Then connect the sealing rail and the side clamp at the appropriate height to the system bar.
  • Angle adapter: For fixing the system bars to inclined walls. Screw the angle adapter onto the system bar, and then screw the head plate onto the angle adapter. Then clamp the system bar between the floor and the slant.
  • Self-adhesive zippers: For application on the plastic foil. For easy entry and exit of the construction site. Stick the zipper and cut the film for the passage.
  • Carrying bag: bag with sturdy zipper for stable transport and handling, as well as integrated bag for accessories. Washable surface inside and outside.
  • Quick release adapter for system poles: The spring adapter is screwed onto the system pole and is used for easier clamping of the poles between floor and ceiling.
  • System pole extension of 140cm by screwing onto the extendable system pole.

Key features

  • Quick and flexible protection against dust
  • For separating walls, ceilings and partial areas
  • Modular system - individual modules for different applications
  • No covering or taping of doors, windows and furniture
  • For ceilings up to 5m high
  • Tool-free use and easy to set up in a few minutes without a ladder
  • No subsequent cleaning
  • No disposal costs

Product specifications

Specifications Units Profi package
System bars (3.6m)
count
6
Angle adapter
count
6
Sealing rails
count
8
Ceiling clamps
count
8
Side clamps
count
6
Zippers
count
2
Transport bag
count
3
Box size (l x w x h)
mm
1500 x 370 x 420
Net weight
kg
25